
Industry solution
Steam Boilers for Food and Beverage Plants
Sizing steam plant for pasteurisers, retorts, CIP and kettles, with a worked 6 t/h example, accumulator logic and fuel-saving leve...
View detailsYuanda Boiler delivers gas, oil, biomass, coal and electric boilers from 0.5 to 100 t/h, thermal oil heaters to 340 °C and pressure vessels — engineered in Taikang, Henan, and commissioned in more than 80 countries.
Every unit is selected from the load profile, not from a catalogue page: fuel analysis, steam demand curve, pressure and site altitude decide the model, the furnace volume and the heating surface.
Chain grate and moving grate boilers for wood pellets, chips, rice husk, straw and bagasse, 0.5 to 100 t/h.
15 models →Economizers, air preheaters, feedwater treatment and dust collection equipment that complete a boiler house.
3 models →Chain grate coal-fired steam and atmospheric hot water boilers for plants where coal remains the permitted fuel.
11 models →Resistance and electromagnetic steam, hot water and thermal oil units from 7 kW to 2.8 MW, with no local emissions.
13 models →Fire-tube and water-tube steam and hot water boilers fired by natural gas, LPG, diesel or heavy oil, from 0.1 to 100 t/h.
40 models →D1/D2 pressure vessels: steam accumulators, deaerators, heat exchangers and storage tanks built to coded design.
4 models →Yuanda has manufactured boilers in Taikang County since the 1960s. That history shows up in unglamorous places: furnace volumes sized for the actual fuel, tube layouts that can be brushed without dismantling the boiler, and a spare-parts list that still fits a unit installed a decade ago.
The production base covers 60,000 m² with CNC cutting, automatic submerged-arc welding, X-ray and ultrasonic inspection, a universal testing machine and hydrostatic test bays. More than 300 employees, including a dedicated thermal-engineering and commissioning team.
Food plants need dry saturated steam; dyehouses need stable temperature at part load; chemical plants need 300 °C+ in the liquid phase. The boiler, burner, feedwater and controls are specified together.

Industry solution
Sizing steam plant for pasteurisers, retorts, CIP and kettles, with a worked 6 t/h example, accumulator logic and fuel-saving leve...
View details
Industry solution
Batch dyeing steam, stenter heat and cylinder drying in one plant: coincidence factors, a 3.4 MW peak calculation and thermal oil...
View details
Industry solution
Matching steam pressure and thermal oil to reactor, reboiler and dryer duty, with a worked 6 t/h distillation and evaporation exam...
View details
Industry solution
Cylinder drying, corrugator preheat and starch kitchen loads, with a 200 t/day board machine worked example and condensate recover...
View details
Industry solution
Domestic hot water, laundry and kitchen steam sized on occupancy and diversity, with a 300-room hotel worked example and storage s...
View details
Industry solution
Plant sizing and unit selection for 7-70 MW networks: design-week load, N+1 sequencing, 115/70 °C hydraulics and a 20.6 MW worked...
View detailsFood, chemical, textile, construction and institutional heating projects — with the capacity, fuel and outcome stated plainly.
A 4 t/h biomass boiler on rubber wood waste and rice husk supplies vulcanising and moulding steam at a footwea...
3.5 MW thermal oil heater at 300 °C on natural gas, commissioned in 2023 in Rayong, Thailand: the reactors nee...
3 t/h gas steam boiler at 1.0 MPa on natural gas, commissioned in 2022 in Long An, Vietnam: the plant runs one...
4 t/h biomass steam boiler at 1.0 MPa on wood waste, commissioned in 2024 in Binh Duong, Vietnam: sawdust and...
2 t/h biomass steam boiler at 1.0 MPa on coconut shell, commissioned in 2023 in General Santos, Philippines: t...
4 t/h biomass steam boiler at 1.0 MPa on corn cob, commissioned in 2024 in Cagayan de Oro, Philippines: three...
Selection guides, efficiency calculations and maintenance practice written by the engineers who commission the units.
Why coal drying air must be heated indirectly, the 300-350 °C metal limit, a worked 1,000 kg/h evaporation balance, and when gas or biomass wins.
Holding every part is expensive; holding none is worse. A criticality-based spares list, the long-lead items worth stocking, and how to store them so they work.
Switchover sequence, the two-point efficiency penalty and the interlocks that keep two fuel trains safe in one furnace during a coal-to-gas transition.
Litres per person per shift, break-time peak draw and element recovery decide the size, with a 300-person worked example and the scale and power limits.
Capacity in t/h or MW, fuel type and analysis, working pressure, feedwater temperature and the process it serves. We return a model, a drawing set and a budget price — usually within one working day.
We appoint one or two partners per country to quote, deliver and service our boilers locally. Territory protection, factory pricing and commissioning support are part of the agreement.